It is not always possible to connect further generation or demand loads to our networks without making changes to our assets. These changes are due to the network reaching the physical limit of power able to be transferred through it, usually due to thermal, voltage, protection or fault level issues.
Network modifications are designed to the lowest cost solution. However, areas requiring upstream reinforcement may introduce additional timescales or costs for completing a connection.