Clearview Clean Power 2030

{{vm.gspDetailsData ? vm.gspDetailsData.gspName : 'GSP Name'}}

The report below details the current pipeline of projects in our area ordered in line with the NESO Connections Network Design Methodology.

List of Schemes and rolling MW export capacity currently being developed in pipeline order

The project enquiry number you have entered appears to be incorrect.

Please contact box.connectionsreformnged@nationalgrid.com if need help in locating your project details

Generator Type Export Capacity (MW) Position Cumulative Export Capacity (MW)
{{scheme.generatorType}} {{scheme.exportCapacity}} {{scheme.position}} {{scheme.cumulativeExportCapacity}}