Clearview Clean Power 2030
{{vm.gspDetailsData ? vm.gspDetailsData.gspName : 'GSP Name'}}
Across National Grid Electricity Distribution’s region, we have been given a target of having 13.9GW of solar connected to our network by 2030. The report below details the current pipeline of projects in our area ordered in line with the NESO Connections Network Design Methodology.
Across National Grid Electricity Distribution’s region, we have been given a target of having 2.4GW of wind connected to our network by 2030. The report below details the current pipeline of projects in our area ordered in line with the NESO Connections Network Design Methodology.
Across National Grid Electricity Distribution's region, we have been given a target of having 3.0GW of storage connected to our network by 2030, increasing to 3.6GW by 2035. The report below details the current pipeline of projects in our area ordered in line with the NESO Connections Network Design Methodology.
Find project position
List of Schemes and rolling MW export capacity currently being developed in pipeline order
Generator type | Export capacity (MW) | Position | Cumulative export capacity for all projects (MW) | Cumulative export capacity under best view of Gate 2 projects (MW) | Transmission queue entry date | Connection date |
---|---|---|---|---|---|---|
{{scheme.generatorType}} | {{scheme.exportCapacity}} | {{scheme.position}} | {{scheme.cumulativeExportCapacity}} | {{(scheme.found && vm.queueInfo != null && vm.queueInfo.cumulativeExportCapacityCP30) ? vm.queueInfo.cumulativeExportCapacityCP30 : '-'}} | {{(scheme.found && vm.queueInfo != null && vm.queueInfo.tqeDate) ? vm.queueInfo.tqeDate : '-'}} | {{(scheme.found && vm.queueInfo != null) && vm.queueInfo.connectionDate ? vm.queueInfo.connectionDate : '-'}} |