Clearview Clean Power 2030
{{vm.gspDetailsData ? vm.gspDetailsData.gspName : 'GSP Name'}}
The report below details the current pipeline of projects in our area ordered in line with the NESO Connections Network Design Methodology.
List of Schemes and rolling MW export capacity currently being developed in pipeline order
Generator Type | Export Capacity (MW) | Position | Cumulative Export Capacity (MW) |
---|---|---|---|
{{scheme.generatorType}} | {{scheme.exportCapacity}} | {{scheme.position}} | {{scheme.cumulativeExportCapacity}} |