ICP Inspection Results

The graphs below provide an anonymised view of ICP performance relating to the NGED Inspection and Monitoring regime of adoptable assets and includes inspections undertaken on NGED's own works within our four licensed areas.

These are updated monthly to display the most recent reportable month and the previous twelve months on a rolling basis.

Key:

Green Inspection passed              Red Inspection failed
 

Inspection results for October 2024 - 100% stacked chart

 

Inspection results for previous 12 months - 100% stacked chart