A small commercial connection is a one-off single or three phase supply rated up to a maximum 100A per phase for non-domestic premises.
You can apply online for a small connection <300kVA using our easy online application form. Just click the button below to get started.
You can also download an application form here.
You can download our guidance document here.
You will need:
It's easy to find out if we work in your area, all we need is your postcode.
We will require a completed application form to provide details of the type and size of the connection you require. In addition, you will need to enclose:
When we receive your application form we will make an assessment of the works required and associated costs. Once we have completed our assessment we will send you a connection offer. These are valid for 90 days and the works should normally be completed within 90 days from the date of acceptance. This is subject to change; for example, we may need to obtain permissions from third party landowners or the highways agency prior to commencing any works.
Each application is individually assessed and costs are determined in line with our Connection Charging Methodology Statements.
To help give you an idea of the potential costs of connection, we have produced a table of average costs and timescales and a self-serve budget estimate tool which you can use to calculate indicative prices for your site.
Your connection offer will reflect the cost of providing the connections you have requested and will take account of;
In some instances, there may not be enough capacity available on the existing network and we may need to upgrade equipment or install a new transformer. We will discuss this with you once we have completed our initial studies.
We are required to comply with a set of standard timescales under the Connection Guaranteed Standards of Performance although we often issue connections offers in advance of the target deadline.
![]()
Some methods of building do not allow PME, in particular multi-occupancy steel framed buildings, in which case an alternative earthing solution can be provided by your electrical contractor. If we identify that PME cannot be provided for your premises, we will discuss this with you.
The steps associated with requesting a single commercial connection up to 69kVA are set out below:
![]()